Connecting to a sewer

云速加速器苹果-outline

If you're planning to connect or reconnect to one of our sewers, you’ll need our consent before you go ahead. That’s because we need to check the connection will work as planned and that it won’t potentially cause problems such as sewer flooding or pollution. We have legal duties around this, set out in Section 94 of the Water Industry Act 1991 (‘the Act’).

Sewer connections can be made directly to a public sewer or indirectly to a private drain that in turn discharges to a public sewer. Whether your connection is direct, indirect, or if you're seeking to relocate an existing manhole, an application form must be completed.

You can either connect to a local sewer under Section 106 of the Act or in some circumstances to a trunk or chemical sewer under Section 107 of the Act. Connecting to trunk or chemical sewer can be complex and dangerous so we'll need to carry out this work for you.

If your proposals are covered by a planning application, no right of connection to a public sewer exists under the Water Industry Act 1991 until planning approval has been granted and any drainage conditions discharged. We'll therefore be unable to approve a sewer connection application made before planning is granted.

云速加速器苹果-outline

云速加速器苹果-outline

tyl加速器官网,tyl加速器,tyl加速器特洛伊,  蓝兔子加速器官网,蓝兔子加速器vnp,蓝兔子加速器2024,蓝兔子加速器vqn  峰哥博客破解版,峰哥博客pc版下载,峰哥博客vp,峰哥博客vn  miru免费永久加速,miru7天试用,miru2024,miruvp  快鸭vp加速器,小黄鸭加速器,快鸭加速器官网,  飞鸟加速器,外网加速软件免费,暴喵加速器兑换码,爆猫加速器免费吗  极光vp加速器,极光vp永久免费官网,极光vp加速器官网地址,  chat中文版免费版,socloud,socloud安卓下载,clash安卓下载